INSTALASI FILTER KOLAM RENANG

INSTALASI FILTERISASI KOLAM RENANG
(SWIMMING POOL FILTRATION INSTALLATION )


  

S P E C I F I C A T I O N
A. Scope of Work & Design Information 
B. Filters, Air Blower, Flow Meter & Underwater Lighting 
C. Swimming Pool Circulating Pumps and Chemical Feed Pumps and Tanks
D. Piping, Valves & Fittings
E. Electrical Details :
    - Control Panels & Components 
    - LV Cables & Cable Distribution
F. Controls 
G. Insulation, Painting & Protection 
H. Testing and Commissioning
I. Servicing and Maintenance


S C H E D U L E
A. Schedule of Drawings 
B. Schedule of Technical Requirements 
C. Schedule of Prices (R1) 
D. Schedule of Rates 
E. Schedule of Daywork
F. Schedule of Servicing & Maintenance 
G. Schedule of Technical Particulars 
H. Schedule of Deviations 
I. Schedule of Site Staff
J. Schedule of Sub-let Works 
K. Schedule of Current Works 
L. Schedule of Previous Works

Untuk Info Lebih Lanjut Dalam Rencana Pembuatan Kolam Renang Olimpik, Club House, Water Park, hubungi di Hotline :

Office :
Jl.Raya Grogol seberang, No. 3 Rt.001 / rw. 06. Limo, cinere, Depok, Jawa Barat

Info :
Telp. 021.77972751
(Call/wa) : 0811 94 24 28 / 0812 9156 5358

Email : albianpools@gmail.com
#AlbianPool
#AlbianPoolStudio
#AlbianPoolShop

Tidak ada komentar:

Posting Komentar